It should be noted that all of the signalization projects have generally involved illumination and channelization improvements. Thus, these projects would not be repeated under the other sub-categories.
Petrovitsky Road/Petrovistky Parkway (Parkside Drive), King County, WA. Prepared signal PS&E for the construction of a new signal at the intersection. Project was fast-tracked through the County with plans complete and approved and signal constructed and operational within 7 months from design start.
Petrovitsky Parkway/School-Park Pedestrian Crossing, King County, WA. Prepared signal PS&E for the construction of a new pedestrian signal and provided assistance through construction. Project was fast-tracked through the County review.
Riverside Bridge Replacement, Mt Vernon, WA. Prepared signal design plans, and cost estimates for the construction of a new signal at the intersection of Riverside Dr/Pacific Pl, as well as for the signal modifications at the Burlington Blvd/George Hopper Rd intersection. In addition, prepared 3 separate temporary signals for three different phases of construction at the Burlington Blvd/Whitmarsh Rd intersection. Furthermore, prepared interconnect plans on Riverside Drive and Burlington Boulevard between Continental Place to George Hopper Road.