As noted in the Signals listing, the vast majority of signal design projects also include channelization improvements. The following is a list of additional projects of which the main emphasis was signing and channelization improvements.
SR 150, Manson WA. Prepared PS&E for left-turn lane channelization and temporary construction detour plans and road closure plans.
Columbia Slough Consolidation Conduit, Traffic Control, Portland, OR. Prepared extensive detour plans and temporary channelization plans for five intersections along Columbia Boulevard due to major sewer main construction.